+86-18901131178
Sitemap |  RSS |  XML

Company News

Company News
  • All kinds of problems will occur in the use of any equipment, and these problems have nothing to do with the quality of the brand or the purchase price. Generally speaking, if you choose a relatively sophisticated product like a constant temperature and humidity air conditioner, if you choose a better brand, it is not easy to have problems at the beginning. Generally, there will be some small problems after two or three years of use.

    2022-12-05

  • The Wanjiazhai Water Conservancy Project is located in the canyon of the Tuoketuo-Longkou river section, the main stream of the Yellow River. The left bank belongs to Pianguan County, Shanxi Province. The right bank belongs to the Zhungeer Banner of the Inner Mongolia Autonomous Region.

    2022-12-05

  • Power inverter power supply is a power protection device with energy storage device.

    2022-12-05

  • The national key project, the Ali Electricity Interconnection Project, is fully connected in Shigatse City and Ali area. This is the UHV power transmission and transformation project with the highest altitude and the longest distance in the world so far. It is the 4th "Power Sky Road" following the Qinghai-Tibet Electric Power Networking, Sichuan-Tibet Electricity Networking, and Tibet-China Electricity Networking projects.

    2022-12-05

  • Power utility UPS power system, power utility inverter power system is made of power utility UPS, power utility inverter, intelligent monitor, feeder unit, acquisition unit, etc., which is specially customized for the power system.

    2022-12-05